Epic: M0 — Foundation & workflow #1
Labels
No milestone
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
public/wanderer#1
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Goal: stand up the fork dev loop so every later change ships cleanly.
origin(oss),upstream(open-wanderer/wanderer),ghfork(GitHub fork — defer until first PR)upstream-maintracking branch (never carries our patches; base for upstream PRs)oss/wandererimage (kaniko), Flux deploy swapsflomp/*→ our image.forgejo/workflows/upstream-sync.yml)oss/wanderer-pluginsrepo + WASM SDK scaffold (fromplugins/sdk) (#9, nowpublic/wanderer-plugins)Status clarification (keeping this honest).
The prerequisite foundation is live —
ossorg,oss/wandererwritable fork, org labels, milestones, this ticket space. But the M0 dev-loop tasks are not started: local clone + remotes (#6), GitOps image build (#7), upstream-sync Action (#8),wanderer-pluginsrepo (#9). We jumped to M1.2 (#11) for momentum. #6 + #7 are the near-term prerequisites to run vitest in CI and deploy. Boxes left unchecked accordingly.oss/wanderer-plugins+ WASM SDK scaffold #9M0 is done. Verified 2026-11-12 in the stale-issue sweep (read-only, Forgejo API).
.forgejo/workflows/upstream-sync.ymlis onmainanddeploy. It runs every Sunday at 03:10 UTC, merges upstream into a datedupstream-sync/<date>branch and opens a PR. The scheduled runs on 2026-11-01 and 2026-11-08 succeeded. No sync PR was needed, because upstreammainhad not moved. Child #8 was closed 2026-10-31.public/wanderer-pluginsexists ("WASM plugins for wanderer (fork-specific; SDK = upstream plugins/sdk)") with.forgejo/,Makefile,example/andhostcheck/. Child #9 was closed 2026-11-04.main,deploy,deploy-preview,main-v0.21.2,deploy-v0.21.2,feat/78-coverage-ui,fix/78-coverage-review,fix/75-76-loop-gen. None of the imported upstream WIP branches (feat/pluginRouting,fixTrailEditIndex2, …) is still here.image.ymlondeploy.Every box is ticked, so I'm closing this.
🤖 Generated with Claude Code