ci: add a Forgejo PR gate for the Mirus fork #1

Merged
maximus merged 2 commits from ci/pr-gate into release/mirus 2026-11-25 12:03:01 +00:00
Member

Merge-queue rollout (step 4): adds a Forgejo PR test gate so release/mirus can require a check and the repo can join the merge-train queue.

New .forgejo/workflows/ci.yml (ci / test), rust:1-bookworm: cargo build --locked, then cargo test --locked -- help:: sync_status:: task_details::, the unit tests of the modules our patches add or change (10 tests). Upstream's suite needs a Taskwarrior built from source and is not run. Local run: build about 1 min, 10 passed.

Upstream .github/workflows are untouched. Side effect: with .forgejo/workflows present, Forgejo stops running the upstream GitHub workflows here (docs.yml failed on every push, 25 failed runs).

After merge, release/mirus requires ci / test (pull_request).

🤖 Generated with Claude Code

https://claude.ai/code/session_01XMf4EHDsxSUaKJC2q1H41t

Merge-queue rollout (step 4): adds a Forgejo PR test gate so `release/mirus` can require a check and the repo can join the merge-train queue. New `.forgejo/workflows/ci.yml` (`ci / test`), `rust:1-bookworm`: `cargo build --locked`, then `cargo test --locked -- help:: sync_status:: task_details::`, the unit tests of the modules our patches add or change (10 tests). Upstream's suite needs a Taskwarrior built from source and is not run. Local run: build about 1 min, 10 passed. Upstream `.github/workflows` are untouched. Side effect: with `.forgejo/workflows` present, Forgejo stops running the upstream GitHub workflows here (`docs.yml` failed on every push, 25 failed runs). After merge, `release/mirus` requires `ci / test (pull_request)`. 🤖 Generated with [Claude Code](https://claude.com/claude-code) https://claude.ai/code/session_01XMf4EHDsxSUaKJC2q1H41t
ci: add a Forgejo PR gate for the Mirus fork
Some checks failed
Check Pull Requests / Prevent Merging (pull_request_target) Has been skipped
Check Pull Requests / check-title (pull_request_target) Failing after 6s
Check Pull Requests / check-breaking-change-label (pull_request_target) Failing after 4s
ci / test (pull_request) Successful in 44s
8f15e6dbc5
.forgejo/workflows/ci.yml builds the fork (cargo build --locked) and runs
the unit tests of the modules our patches add or change (help, sync_status,
task_details) on every PR. Upstream's .github workflows stay untouched;
with this directory present Forgejo no longer runs them (docs.yml failed on
every push). It becomes the required check for the merge queue.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01XMf4EHDsxSUaKJC2q1H41t
ci: keep the job token out of the checkout
Some checks failed
Check Pull Requests / Prevent Merging (pull_request_target) Has been skipped
Check Pull Requests / check-breaking-change-label (pull_request_target) Failing after 3s
Check Pull Requests / check-title (pull_request_target) Failing after 4s
ci / test (pull_request) Successful in 48s
b2bdcf5d27
Public repo: the checkout fetches without credentials (shell git) or with
persist-credentials: false (actions/checkout), so the PR code that runs
later in the job (build scripts, tests) cannot read a token from
.git/config.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01XMf4EHDsxSUaKJC2q1H41t
maximus merged commit b2bdcf5d27 into release/mirus 2026-11-25 12:03:01 +00:00
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
public/taskwarrior-tui!1
No description provided.